Shilchar Technologies Ltd. has manufactured generator transformers for hydropower projects exceeding 270 MW capacity up to December 2025.

Design Criteria for Hydro Generator Transformers:

  • These transformers operate at rated load and voltage to match the dynamic needs of hydropower plants.
  • Hydel power plants must respond quickly to sudden power demands and immediately shut down when load is removed from the grid.
  • Transformers are constructed with low flux density cores to meet load rejection requirements as per IS:2026 standards.
  • Equipped with 2-core Neutral CT and a down coming earthing bar from the HV side neutral for enhanced safety and protection.

Our hydro generator transformers are designed to ensure reliable, efficient operation under the challenging conditions of hydropower generation.